Home remodeling › Exterior › Roof replacement
Exterior remodeling

Roof replacement A dry roof from deck up

A roof replacement removes the old roofing down to the deck, repairs damaged sheathing, and installs new underlayment, flashing, ventilation and roofing. The shingles get the attention, but the flashing at chimneys, walls, valleys and vents is what usually decides whether a new roof stays leak-free. Call 804-566-7669.

Talk to a local contractor about roof replacement
Get scope, schedule and price in writing
Calling does not commit you to hire anyone
Photo: Lumin Osity on Unsplash

How it works

  1. Call 804-566-7669Your call connects to an independent contractor in your area.
  2. Talk it throughSay what you want done, the age of the house and when you hope to start.
  3. Get it in writingScope, schedule and price on paper before any work starts. Then you decide.
Call 804-566-7669Calls connect to an independent local contractor.

1What roof replacement involves

The short answerA roof replacement removes the old roofing down to the deck, repairs damaged sheathing, and installs new underlayment, flashing, ventilation and roofing. The shingles get the attention, but the flashing at chimneys, walls, valleys and vents is what usually decides whether a new roof stays leak-free.

Most roof replacements start with a full tear-off of the old shingles and underlayment so the crew can inspect the roof deck. Some places allow a second layer of shingles over the first, but most codes limit the number of layers, and an overlay hides rotted sheathing and adds weight. A tear-off also lets the crew replace old flashing instead of reusing it, which is one of the most common sources of leaks on a new roof.

Asphalt shingles are the most common choice. Architectural shingles are thicker and more dimensional than flat three-tab styles. Metal roofing, either standing seam or metal shingles, lasts longer and sheds snow well. Tile, slate and wood shakes are heavier or more specialized and may need structural review. Low-slope sections, such as porch roofs or additions, usually need a membrane roof like modified bitumen or a single-ply system instead of shingles, because shingles need enough pitch to shed water.

Under the roofing, the crew installs underlayment, drip edge at the eaves and rakes, and in colder climates an ice-and-water barrier along the eaves and in valleys to help with ice dams. Ventilation is part of the job too: intake at the soffits and exhaust at the ridge or roof vents help control attic heat and moisture. If your attic has signs of moisture or mold, it may help to read about mold before the roof goes on.

How the work usually goes

  1. Inspection and measurementThe contractor checks the roof, attic and flashing, measures the roof area and pitch, and notes how many layers need to come off.
  2. Permit and material orderIn most places a permit is pulled, and shingles, underlayment, flashing and vents are ordered and delivered.
  3. Tear-off and deck repairOld roofing is stripped to the deck, and any soft or rotted sheathing is replaced before anything new goes down.
  4. Underlayment, drip edge and ice barrierDrip edge, ice-and-water barrier where needed, and underlayment are installed so the deck is protected even before the roofing goes on.
  5. Flashing, roofing and ventilationNew step flashing, valley flashing, pipe boots and chimney flashing are installed with the shingles or panels, and ridge or roof vents are added.
  6. Cleanup and final inspectionThe crew removes debris, sweeps the yard for nails with a magnet, and the work is inspected where your area requires it.

2What decides it

What decides itThe condition of the roof deck and the quality of the flashing details decide how a roof replacement goes. Rotted sheathing found during tear-off changes the cost, and reused or poorly installed flashing is the most common cause of leaks on a new roof.
PermitsRoof replacement usually needs a permit in most places, and some areas also have rules on the number of layers allowed or on wind and fire ratings. Check local code and any HOA rules on color or material.
TimelineA typical asphalt shingle roof on a single-family home often takes one to three days of work, while larger, steeper or metal and tile roofs can take a week or more. Weather and material delivery can add time.
Cost driversCost is driven by roof size and pitch, the number of layers to tear off, how much rotted decking is found, the roofing material, and how many chimneys, skylights, valleys and walls need flashing.

Is it time to replace your roof?

Call to find out whether your roof needs repair or full replacement
Call about tear-off, decking repair and flashing on a new roof
Call for help choosing between asphalt shingles and metal roofing

3Common mistakes

  1. Roofing over a failing roofAn overlay can hide rotted decking and old flashing problems, and most codes limit the number of layers. Ask for a tear-off unless the contractor can explain why an overlay makes sense for your roof.
  2. Reusing old flashingOld step and chimney flashing is often bent, rusted or sealed with caulk. Ask for new flashing where it can be replaced, so the details match the new roof.
  3. Ignoring attic ventilationPoor ventilation can trap heat and moisture, shorten shingle life and contribute to ice dams. Ask how intake and exhaust will be balanced.
  4. Not asking about deckingMany quotes cover only a small amount of sheathing replacement. Ask how extra rotted decking will be priced so there are no surprises mid-job.

4When to call a pro

Shingles are curling, cracking or missing, or you find granules collecting in the gutters.
You see water stains on ceilings or in the attic after rain.
The roof deck feels soft or looks like it sags between rafters.
Leaks keep coming back around chimneys, skylights or roof-to-wall joints even after repairs.

Is it time to replace your roof?

Talk to a local contractor about it today.

5Questions

What happens when I call?

Your call to 804-566-7669 connects to an independent local contractor. Describe the project, ask your questions, and decide whether you want a quote. Calling does not commit you to anything. iLikeToFix earns a referral fee when a call connects; here is how that works.

How do I know if my roof needs replacing or just repair?

Isolated damage, such as a few missing shingles or one failed pipe boot, can usually be repaired. Widespread curling, cracking, granule loss, multiple leaks or soft decking point toward replacement. Age matters too, since asphalt roofs wear out over time. A local contractor can check the roof and attic and explain whether repairs will buy you meaningful time.

Can new shingles go over my old roof?

Sometimes. Many codes allow a limited number of layers, often no more than two, but an overlay hides the deck, keeps old flashing in place and adds weight. Some shingle manufacturers also have specific requirements for installing over an existing roof. A full tear-off costs more up front but lets the crew fix rot and install new flashing.

Will I need to leave my house during a roof replacement?

Most people stay home. It is loud, and nails and debris can fall around the house, so keep kids, pets and cars clear of the work area. It also helps to move fragile items off walls and shelves, since hammering can shake the house, and to cover stored items in the attic, where dust and debris can fall through.

Does a new roof include gutters?

Not always. Gutters are often removed or loosened during a roof replacement, and some roofers offer to replace them as part of the job. Ask whether gutters, drip edge and fascia repair are included in your quote. If your gutters are old or undersized, it may make sense to plan gutters and drainage work right after the roof.

Related exterior jobs

Roof replacement start with one call

Talk to a local contractor. Calling does not commit you to anything.

Call to find out whether your roof needs repair or full replacement
Call about tear-off, decking repair and flashing on a new roof
Call for help choosing between asphalt shingles and metal roofing